It's gone.
But it was holding up the first floor, so Trevor has installed two steel posts to support the existing steel beams. The posts spring from the existing slab, so to minimise the cold bridge, the posts sit on insulated blocks (supplied by Insula), set within the insulation zone.
4 Comments
|
AUTHOR